phone Call Me Back

All Websites - Trade Pallet Deal - Banner

Free Heavy Duty Staple Gun Kit on Orders Over £500 + VAT
Direct To Site Delivery
Free Next Working Delivery on Orders Over £100 + VAT

How to Insulate Your Roof Without Any Kingspan or Celotex

Difficulty: Medium • 7 Steps

This step by step guide shows how to insulate a roof using our Triple Layer System – Exclusive to Multifoil-Insulation!

The benefit of our system is that there is no requirement for Rigid PIR Insulation, such as Kingspan and Celotex.

Our Triple Layer system is proven to save on cost, space, wastage & installation time.

Both SuperQuilt and BreatherQuilt included in this system are fully certified. These certifications include LABC & BDA Kiwa. Multifoil Insulation’s Triple Layer system will achieve a minimum U-value of 0.18 on a pitched roof. You are able to retrieve a PDF document displaying the U-value achieved, which can be simply forwarded to building control. To get a copy of this document, please visit our Free to use Online U-value Calculator – Click Here to Use!

Multifoil-Insulation are the leading UK & European distributor of Multifoil Insulation products. We offer free next working day delivery to the UK Mainland (Order before 2pm)

Method Steps

  1. Install first run of BreatherQuilt

    Firstly, install YBS BreatherQuilt on the external of the pitched roof. Ensure the reflective foil is facing inwards. Starting at the bottom of the rafters, staple BreatherQuilt to the first rafter using 14mm staples (Max 300mm spacing). Roll BreatherQuilt horizontally across each rafter, stapling continuously. BreatherQuilt should sag between the rafters as opposed to being pulled taught. Ensure that once the tile battens are installed, there is a clear 10mm gap between the top layer of BreatherQuilt and the tile battens.

  2. Install next run(s) of BreatherQuilt

    Tape a line of 50mm Thermaseal Double Sided Tape along the top edge of the material. Next, install the next layer of BreatherQuilt, overlapping the product by 100mm. Staple as previously and ensure the tape is secured and sealed. This is to be repeated dependent on how many runs are required for the roof. Additional rolls on the verticals should be butt jointed on the rafters. Ensure the butt jointed rolls are stapled as previous and taped using waterproof tape.

  3. Install Tile Battens & Tiles

    At the eaves, BreatherQuilt should extend onto a suitable eaves carrier. This works in the same method as standard breather membranes. Proceed next by installing horizontal tile battens, on the top of the BreatherQuilt. Finally, finish by install tiles or slates.

  4. Install 2 Layers of SuperQuilt Under Rafter

    Both layers of SuperQuilt can now be installed from the internal (underside) of the rafters. The first layer of SuperQuilt is to be recessed in-between the rafters, the 2nd SuperQuilt is a flay layer under rafter. Ensure that there would be a clear cavity between SuperQuilt and BreatherQuilt.

  5. Recess 1st Layer of SuperQuilt

    SuperQuilt is stapled to the underside of the first rafter. SuperQuilt is next recessed into the rafter (25mm), and fixed with staples of with battens. The material is then pulled taught and fixed to the opposite rafter. SuperQuilt is then wrapped around the rafter, ensuring stapling regularly, and the procedure starts again. SuperQuilt is overlapped by 50mm, ensure fully tape and seal using Thermaseal Foil Joining Tape over the laps and around the perimeter.

  6. Install 2nd Layer of SuperQuilt

    Once the first layer of SuperQuilt is installed, proceed by installing the second layer. Staple or nail the second layer through the first layer into the rafters behind. Ensure this layer is also pulled taught, there will then be a cavity between the two layers of SuperQuilt. As per the first layer, the second layer is also overlapped by 50mm. Ensure again the product is fully taped and sealed using Thermaseal Foil Joining Tape.

  7. Internal Finishing

    Once both layers are installed and taped, you are ready for your batten & plasterboard. Start by installing min 25mm battens on the insulation. We advise to cross-batten, however vertical battens can be used. Finish by installing 12.5mm Plasterboard. There is no requirement for a Foiled-back plasterboard or VCL. SuperQuilt works as a high performance Vapour Control Layer when taped and sealed.

Buy Tools & Materials

Disclaimer – This guide is based on 100mm Rafters @ 400mm centres, with access to both the internal and external of a pitched roof.  SuperQuilt and BreatherQuilt should be installed in harmony with the manufacturers certificate, fixing instructions and good building practice. Our Multifoils are to be cut using a craft knife or a sharp pair of scissors – Available in our Multifoil Fitting Kit. No personal protective equipment, clothing or handling is required.

Multifoil-Insulation cannot be held responsible for any losses financially or physically from advice provided in this How-To-Guide.

trending_flatBack to All Guides